We will build a 24' x 32' and 12' x 14' addition on this foundation. Save this site to your favorites to monitor our progress and see new projects as they start. |
click on image |
After the excavation is complete we pour a concrete footing and set our forms on top, then pour our foundation walls. |
After we strip the forms and break off the metal ties we fill the holes with hydraulic cement and apply foundation coating to all the areas that will be below grade. To make sure our foundation stays waterproof we have installed a plastic perimeter drain to be topped off with twelve inches of crushed stone. |
click on image |
click on image |
We are using open webb truss floor joists that span 24' and don't require any beams or columns for support. This building technique not only saves labor but allows the basement to be wide open. |
After a week of framing with a three man crew the main structure is almost complete. |
click on image |
click on image |
Now we have both sections of our project built. We will be stripping the roof shingles off the main house and roof them both to get a nice professional looking job. |
All of the vinyl siding is installed and we are ready for landscaping.We are almost completely done on the inside as well. Take a look inside. |